Commit Graph

4 Commits

Author SHA1 Message Date
Antoni Nuñez Romeu 1c31362e0b Rebranding app and naming 2026-07-01 15:54:10 +02:00
Antoni Nuñez Romeu db0935eb16 feat(fullstack): implement observability and redesign frontend UI
Build & Push Docker Images / test-backend (push) Failing after 36s
Build & Push Docker Images / test-frontend (push) Successful in 29s
Build & Push Docker Images / build-backend (push) Has been skipped
Build & Push Docker Images / build-frontend (push) Has been skipped
Build & Push Docker Images / deploy (push) Successful in 7s
This commit introduces comprehensive observability for both backend and frontend, alongside a major UI/UX overhaul to align with modern design standards (Material 3 inspired) and improve localization.

Backend changes:
- Integrated OpenTelemetry SDK for distributed tracing.
- Added Pino for structured JSON logging with OTel instrumentation for trace/span correlation.
- Configured OTLP exporters to route traces and logs to Grafana Alloy.
- Updated docker-compose to include necessary environment variables for observability.

Frontend changes:
- Integrated Grafana Faro for Real User Monitoring (RUM), capturing Web Vitals, JS errors, and user interactions.
- Redesigned the entire UI using a new color palette and Material 3 design principles.
- Refactored component architecture (App, Home, Search, Scanner, Profile, Alerts views) for better state management and navigation.
- Improved mobile UX with a redesigned Bottom Navigation bar and Top Bar.
- Localized the interface to Spanish (es).
- Updated assets, icons, and PWA configuration (manifest, icons).
- Refactored CSS to use a centralized design token system (CSS variables).

Observability enables better debugging and performance monitoring across the entire stack.
2026-07-01 11:48:27 +02:00
Antoni Nuñez Romeu 3dc2c4c9f2 fix front dockerfile
Build & Push Docker Images / test-backend (push) Successful in 43s
Build & Push Docker Images / test-frontend (push) Successful in 52s
Build & Push Docker Images / build-backend (push) Successful in 57s
Build & Push Docker Images / build-frontend (push) Successful in 2m18s
2026-05-21 16:39:11 +02:00
Antoni Nuñez Romeu cc9a24d6d6 Plan Done, Dockerization and cleanup
Build & Push Docker Images / test-backend (push) Successful in 55s
Build & Push Docker Images / test-frontend (push) Successful in 43s
Run Tests / test-backend (push) Successful in 48s
Run Tests / test-frontend (push) Successful in 42s
Build & Push Docker Images / build-backend (push) Failing after 4m7s
Build & Push Docker Images / build-frontend (push) Failing after 32s
2026-05-19 18:16:28 +02:00